Hesaide River Dredging Sludge Treatment System

River Dredging Sludge treatment

Project address: Hebei

Category: River Dredging Sludge treatment

Common models: SDZ250/1250-30U、 SDZ500/1500-30U

Hesaide River Dredging Sludge Treatment System

1. Project Background

???? Location: River dredging project (urban/rural)
???? Challenge: Efficient silt dewatering with space constraints and eco-friendly disposal
???? SolutionVehicle-mounted filter press system for on-site sludge treatment


2. Process Flow

Step 1: Silt Extraction & Pre-Treatment

  • Dredging: Hydraulic pump extracts silt from riverbed

  • Vibrating Screen: Removes debris >0.5mm (stones, branches, trash)

  • Slurry Storage: Screened sludge stored in buffer tank

Step 2: Chemical Conditioning

  • Polymer Dosing: Flocculant (PAM) added to enhance solid-liquid separation

  • Mixing Tank: Ensures uniform flocculation

Step 3: Filter Press Dewatering

  • Vehicle-Mounted Filter Press:

    • Fast filtration & solidification (cycle time: 30-60 min)

    • Low-moisture cakes (≤60%) – suitable for brick-making or landfill

  • Clean Water Discharge:

    • TSS <50mg/L → Safe for rainwater pipes or river return

Step 4: Mud Cake Reuse

  • Construction Material: Mixed with cement for road base/bricks

  • Landfill Cover: Alternative to soil


Hesaide River Dredging Sludge Treatment System

3. Key Equipment

EquipmentModelFunction
Vibrating ScreenVBS-500Removes >0.5mm debris
Flocculation UnitPAM-200Optimizes sludge dewatering
Filter PressCZ-XMYZ100/1250-30U (Vehicle-mounted)100m² area, 30mm cake
Water PolishingSSF-10 (Sand Filter)Ensures clean discharge

4. Performance Data

✔ Processing Capacity50–100 m³/day (depending on silt density)
✔ Cake Moisture55–60% (can reach 50% with diaphragm squeeze)
✔ Water ClarityTSS <30mg/L, pH 6–8 (meets GB 8978-1996 discharge standards)
✔ Energy UseLow power consumption (7.5kW motor)


5. Advantages of Mobile System

✅ No Fixed Infrastructure – Ideal for remote/riverbank sites
✅ Fast Deployment – <4 hours setup time
✅ Zero Secondary Pollution – Closed-loop water recycling
✅ Cost Savings – 60% lower transport costs (vs wet sludge hauling)


6. Economic & Environmental Benefits

???? Cost Comparison:

MethodCost (¥/ton DS)
Mobile Filter Press120–150
Traditional Drying Beds200–300
Offsite Disposal250–400

???? Sustainability:

  • 100% water recovery (reused or safely discharged)

  • Mud cake recycling reduces landfill demand


???? Interested in this solution? Provide:
① Silt sample analysis (solid content, particle size)
② Daily processing volume
③ Disposal/reuse requirements

Attached:

  • [Video] Vehicle-mounted system in operation

  • [Report] Mud cake strength test data


7. FAQ

Q: Can it handle high-organic silt?
A: Yes, with adjusted polymer dosing (anionic PAM recommended).

Q: What’s the minimum site area needed?
A: 10×20m for full setup (smaller if using elevated filter press).

Q: How to prevent filter cloth clogging?
A: Automatic cloth washing system (standard in our units).

Need customized proposals? Contact our river remediation team!

Hesaide River Dredging Sludge Treatment System

GET IN TOUCH

Leave it to us. Our experienced team will help you to customise the best solution for you.

Contact Us

Tel.: +86 157 3217 4597

Email: andy@hbsdfilterpress.com

Add.: No.38, Kechuang Fifth Street, Economic and Technological Development Zone, Beijing

Copyright @ Hesaide Intelligent Environmental Engineering Technology Co., Ltd. All Rights Reserved | Sitemap

WeChat